Adaro
AI's coal hauling operations are carried out by its mining contractors with a fleet of than 300 double-trailer trucks with capacity of 130 tonnes per truck, along the 80 km of dedicated hauling road that connects AI's mine and Kelanis port on the Barito River, a dedicated terminal where coal is processed and loaded onto barges.
